- 6 Palermo Avenue, Coral Gables, FL 33134
- (305) 262-1925
- info@pinnaclecei.com
projects / Transit
Coral Springs Downtown Pathway (NW 29th Street & Coral Hills Drive)
The primary scope of the project was replacement of the old sidewalk and addition of a newly constructed sidewalk pathway with three plazas that included decorative lighting, benches and trash receptacles. It also included replacement of irrigation, trees and thermoplastic striping.
The project consisted of earthwork, structural and non-structural concrete, new lighting, landscaping, irrigation, thermoplastic striping, signage, vehicle, and pedestrian MOT.
Doug Schumann, PE
$352K
City of Coral Springs
Coral Springs, Broward County, Florida
October 2015 – June 2016
10.1 Roadway CEI 10.3 Construction Materials Inspection

Movable Bridge
Bascule bridge rehabilitations and reconstructions

Roadway
Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge
Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access
Interstates, freeways and expressways

ITS & Tolling
All components of Intelligent Transportation Systems (ITS) and signaling

Transit
Vertical construction, multimodal facilities and other infrastructure projects