projects / Transit

Coral Springs Downtown Pathway (NW 29th Street & Coral Hills Drive)

The primary scope of the project was replacement of the old sidewalk and addition of a newly constructed sidewalk pathway with three plazas that included decorative lighting, benches and trash receptacles. It also included replacement of irrigation, trees and thermoplastic striping.

The project consisted of earthwork, structural and non-structural concrete, new lighting, landscaping, irrigation, thermoplastic striping, signage, vehicle, and pedestrian MOT.

Doug Schumann, PE

Contract

$352K

Client

City of Coral Springs

Location

Coral Springs, Broward County, Florida

Duration

October 2015 – June 2016

FDOT Work Categories

10.1 Roadway CEI
10.3 Construction Materials Inspection

Project Gallery

Coral Springs Downtown Pathway (NW 29th Street & Coral Hills Drive)

Related Projects
Browse All Projects

Movable Bridge

Bascule bridge rehabilitations and reconstructions

Roadway

Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge

Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access

Interstates, freeways and expressways

ITS & Tolling

All components of Intelligent Transportation Systems (ITS) and signaling

Transit

Vertical construction, multimodal facilities and other infrastructure projects