Prior to joining Pinnacle, Roland Rodriguez, PE served as senior project engineer for this 31-month CEI Residency contract. He managed a CEI staff of 18, including project administrators, contract support specialists, resident compliance specialists and inspectors. 

The project consisted of 21 separate construction contracts throughout the Florida Keys in Monroe County. The CEI contract consisted of several projects running concurrently at multiple locations.

The scope of projects was wide-ranging, including milling and resurfacing, widening and reconstruction, signalization, lighting, and drainage. It also included several bridge substructure and superstructure rehabilitation projects, including spall repairs and cathodic protection using direct and impressed current. There was also the removal and replacement of three post-tensioned tendons on the Seven Mile Bridge.

Roland Rodriguez, PE
Prior to joining Pinnacle

Contract

$70 million

Client

FDOT District 6

Location

Florida Keys, Monroe County, Florida

Duration

July 2007 – December 2009

FDOT Work Categories

10.1 Roadway CEI
10.3 Construction Materials Inspection
10.4 Minor Bridge and Miscellaneous Structures CEI
10.5.3 Major Bridge CEI – Segmental

Project Gallery

Monroe (Keys) Residency

Browse All Projects

Movable Bridge

Bascule bridge rehabilitations and reconstructions

Roadway

Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge

Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access

Interstates, freeways and expressways

ITS & Tolling

All components of Intelligent Transportation Systems (ITS) and signaling

Transit

Vertical construction, multimodal facilities and other infrastructure projects