projects / Limited Access

SR 924/Gratigny Parkway

The scope of work consisted of the installation of a new drainage conveyance system, including 15 drainage structures, 1,529 LF of drainage pipe ranging from 15” to 54” diameter, the construction of a 2.31 acre retention pond, 84 LF of twin jack and bore 36” pipe, and 16,580 SF of temporary sheet pile; the installation of six Solar-Powered Speed Feedback assemblies (SPSF), four on the outside shoulder and two which are called out to be installed within the median barrier wall; the milling and resurfacing of all lanes and ramps of SR 924 from SR 826 to just west of NW 67th Avenue.

Sergio Gonzalez, PE

Contract

$3.2 million

Client

Miami-Dade Expressway Authority

Location

Miami-Dade County, Florida

Duration

March 2018 – December 2018

FDOT Work Categories

10.1 Roadway CEI
10.3 Construction Materials Inspection
10.4 Minor Bridge and Miscellaneous Structures CEI

Project Gallery

SR 924/Gratigny Parkway

Related Projects
Browse All Projects

Movable Bridge

Bascule bridge rehabilitations and reconstructions

Roadway

Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge

Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access

Interstates, freeways and expressways

ITS & Tolling

All components of Intelligent Transportation Systems (ITS) and signaling

Transit

Vertical construction, multimodal facilities and other infrastructure projects