I-95 over New River Bridge Rehabilitation

Project included full bridge coating removal and replacement for all steel members comprising the superstructure of the I-95 bridge over the New River. Also included the installation of maintenance inspection platforms.

Art Perez, PE, PSM

Contract

$18 million

Client

FDOT District 4

Location

Broward County, Florida

Duration

July 2013 - April 2015

Work Categories

10.1 Roadway CEI
10.3 Construction Materials Inspection
10.4 Minor Bridge and Miscellaneous Structures CEI
10.5.1 Major Bridge CEI – Concrete
10.5.2 Major Bridge CEI – Steel

Project Gallery

I-95 over New River Bridge Rehabilitation

Browse All Projects

Movable Bridge

Bascule bridge rehabilitations and reconstructions

Roadway

Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge

Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access

Interstates, freeways and expressways

ITS & Tolling

All components of Intelligent Transportation Systems (ITS) and signaling

Transit

Vertical construction, multimodal facilities and other infrastructure projects