- 6 Palermo Avenue, Coral Gables, FL 33134
- (305) 262-1925
- info@pinnaclecei.com
projects / Bridge
SR 90/Tamiami Trail Bridge
This $70M design-build project involves replacement of the existing roadway with 3.1 miles of new bridges and roadway approaches in Everglades National Park (ENP).
This project is part of the Everglades restoration effort known as the Modified Water Deliveries Project (MWDP), a joint undertaking of the US Army Corps of Engineers (USACE), Department of Interior (DOI), National Park Service (NPS), and FDOT.
The project involves extensive reporting and coordination efforts between the Eastern Federal Lands Highway Division (EFLHD), NPS, Florida Department of Environmental Protection (FDEP), FDOT, and South Florida Water Management District (SFWMD).
Responsible for supervision of the Consultant CEI staff and provided overall design and construction project management.
Darren Spence, PE
$70 million
FDOT District 6
Miami-Dade County, Florida
May 2016 – August 2019
10.1 Roadway CEI10.3 Construction Materials Inspection10.4 Minor Bridge and Miscellaneous Structures CEI10.5.1 Major Bridge CEI – Concrete

Movable Bridge
Bascule bridge rehabilitations and reconstructions

Roadway
Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge
Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access
Interstates, freeways and expressways

ITS & Tolling
All components of Intelligent Transportation Systems (ITS) and signaling

Transit
Vertical construction, multimodal facilities and other infrastructure projects