projects / Roadway

CEI Group 213

CEI Group 213 consists of six projects: US 192 at McClain Drive, SR Eau Gallie Boulevard at Turtle Mound Road, US 1 from Miller Cove Road to the Pineda Causeway, SR 528 from US 1 to SR 401, and US 1 from Camp Road to Fay Boulevard.

Projects include milling and resurfacing, extending turn lanes, widening, guardrail enhancements, drainage including constructing an overflow weir structure to drain into the Indian River, lighting, ITS upgrades, and installation of new mast arms.

Contract

$23 million

Client

FDOT District 5

Location

Brevard County, Florida

Duration

May 2022 - Present

FDOT Work Categories

10.1 Roadway CEI
10.3 Construction Materials Inspection
10.4 Minor Bridge and Miscellaneous Structures CEI

Project Gallery

CEI Group 213

Related Projects
Browse All Projects

Movable Bridge

Bascule bridge rehabilitations and reconstructions

Roadway

Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge

Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access

Interstates, freeways and expressways

ITS & Tolling

All components of Intelligent Transportation Systems (ITS) and signaling

Transit

Vertical construction, multimodal facilities and other infrastructure projects