- 6 Palermo Avenue, Coral Gables, FL 33134
- (305) 262-1925
- info@pinnaclecei.com
projects / Roadway
South Dixie Highway Grouping
Work included 4 miles of roadway reconstruction, drainage, bridge widening, signalization, lighting, PTMS, and 2 miles of water main work via a JPA with MDWSD. 18 drilled shafts and 3,600 LF of gravity wall. Over 70,000 LB of reinforcing steel. Bridge widening with 32 piles, 4,400 SF of deck and 1,400 LF of concrete railing.
Art Perez, PE, PSM
$19 million
FDOT District 6
Miami-Dade County, Florida
January 2010 - April 2013
10.1 Roadway CEI10.3 Construction Materials Inspection10.4 Minor Bridge and Miscellaneous Structures CEI

Movable Bridge
Bascule bridge rehabilitations and reconstructions

Roadway
Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge
Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access
Interstates, freeways and expressways

ITS & Tolling
All components of Intelligent Transportation Systems (ITS) and signaling

Transit
Vertical construction, multimodal facilities and other infrastructure projects