projects / Roadway

South Dixie Highway Grouping

Work included 4 miles of roadway reconstruction, drainage, bridge widening, signalization, lighting, PTMS, and 2 miles of water main work via a JPA with MDWSD. 18 drilled shafts and 3,600 LF of gravity wall. Over 70,000 LB of reinforcing steel. Bridge widening with 32 piles, 4,400 SF of deck and 1,400 LF of concrete railing.

Art Perez, PE, PSM

Contract

$19 million

Client

FDOT District 6

Location

Miami-Dade County, Florida

Duration

January 2010 - April 2013

FDOT Work Categories

10.1 Roadway CEI
10.3 Construction Materials Inspection
10.4 Minor Bridge and Miscellaneous Structures CEI

Project Gallery

South Dixie Highway Grouping

Related Projects
Browse All Projects

Movable Bridge

Bascule bridge rehabilitations and reconstructions

Roadway

Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge

Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access

Interstates, freeways and expressways

ITS & Tolling

All components of Intelligent Transportation Systems (ITS) and signaling

Transit

Vertical construction, multimodal facilities and other infrastructure projects