Flagler Grouping
The primary scope of work is full reconstruction of the roadway with a new drainage system; replacing sidewalks to comply with current ADA standards; installing curb and gutter, tree cells, lighting, signalization; reconfiguring alignment to add a bike lane; and upgrading the water main system through three JPAs along four miles in the heavily-urbanized neighborhood of Little Havana.
The project spanned along Flagler Street from 27th Avenue to 2nd Avenue and SW 1st Street from Flagler Street to SW 6th Avenue.
Art Perez, PE, PSM
Doug Schumann, PE
$44 million
FDOT District 6
Miami, Miami-Dade, Florida
March 2016 - February 2019
10.1 Roadway CEI10.3 Construction Materials Inspection10.4 Minor Bridge and Miscellaneous Structures CEI

Movable Bridge
Bascule bridge rehabilitations and reconstructions

Roadway
Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge
Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access
Interstates, freeways and expressways

ITS & Tolling
All components of Intelligent Transportation Systems (ITS) and signaling

Transit
Vertical construction, multimodal facilities and other infrastructure projects