NW 12th Avenue Bascule Bridge Rehabilitation
Control system modification involved the installation of a relay back-up control system. The system consisted of a stand-alone control desk, relay panel, and associated conduits and conductors to provide a fully operational, independent back-up system capable of operating the traffic signals, traffic gates, span locks and hydraulic power units for motion control.
Project administrator was responsible for RFI, RFM, submittal tracking, schedule review, scheduling and conducting progress, and field meetings, as necessary.
Al Banz, PE
$513K
FDOT District 6
Miami, Miami-Dade County, Florida
February 2019 - November 2019
10.1 Roadway CEI10.7 Movable Span Bridge CEI

Movable Bridge
Bascule bridge rehabilitations and reconstructions

Roadway
Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge
Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access
Interstates, freeways and expressways

ITS & Tolling
All components of Intelligent Transportation Systems (ITS) and signaling

Transit
Vertical construction, multimodal facilities and other infrastructure projects