NW 12th Avenue Bascule Bridge Rehabilitation

Control system modification involved the installation of a relay back-up control system. The system consisted of a stand-alone control desk, relay panel, and associated conduits and conductors to provide a fully operational, independent back-up system capable of operating the traffic signals, traffic gates, span locks and hydraulic power units for motion control.

Project administrator was responsible for RFI, RFM, submittal tracking, schedule review, scheduling and conducting progress, and field meetings, as necessary.

Project Engineer

Al Banz, PE

Contract

$513K

Client

FDOT District 6

Location

Miami, Miami-Dade County, Florida

Duration

February 2019 - November 2019

FDOT Work Categories

10.1 Roadway CEI
10.7 Movable Span Bridge CEI

Project Gallery

NW 12th Avenue Bascule Bridge Rehabilitation

Related Projects
Browse All Projects

Movable Bridge

Bascule bridge rehabilitations and reconstructions

Roadway

Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge

Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access

Interstates, freeways and expressways

ITS & Tolling

All components of Intelligent Transportation Systems (ITS) and signaling

Transit

Vertical construction, multimodal facilities and other infrastructure projects