NW 12th Avenue Bascule Bridge Replacement and Roadway

Miscellaneous structures inspection performed for drilled shafts, retaining walls, gravity walls, bulkhead structures, pier walls, overhead cantilevered sign structures and MSE walls. 33 Type VI AASHTO beam and 2,200 LF of steel plate and box girder inspection. Movable span bridge inspection on all electrical and mechanical components.

The roadway project covered two miles that were resurfaced in addition to new drainage, flatwork and signalization.

Art Perez, PE, PSM

Contract

$65 million bridge
$4 million roadway

Client

FDOT District 6

Location

Miami, Miami-Dade, Florida

Duration

March 2006 - August 2009

FDOT Work Categories

8.1 Control Surveying
8.2 Design, Right of Way, and Construction Surveying
10.1 Roadway CEI
10.3 Construction Materials Inspection
10.4 Minor Bridge and Miscellaneous Structures CEI
10.5.1 Major Bridge CEI – Concrete,
10.5.2 Major Bridge CEI – Steel
10.7 Movable Span Bridge CEI

Project Award

FHWA | Environmental Excellence | 2022

Project Gallery

NW 12th Avenue Bascule Bridge Replacement

Related Projects
Browse All Projects

Movable Bridge

Bascule bridge rehabilitations and reconstructions

Roadway

Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge

Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access

Interstates, freeways and expressways

ITS & Tolling

All components of Intelligent Transportation Systems (ITS) and signaling

Transit

Vertical construction, multimodal facilities and other infrastructure projects