NW 27th Avenue Bascule Bridge Rehabilitation

Mechanical and electrical rehabilitation of the twin double-leaf bascule bridges over the Miami River. Work included repairing the existing hydraulic span drive machinery (new hydraulic cylinders, cardanic ring supports, upper clevis assemblies, and reconditioning of the main Hydraulic Power Unit with new valves pump motors), reconditioning the live load shoes and span lock repairs (new guide and receiver shoes, new span lock hydraulic power unit and actuator), replacing hydraulic power unit proportional valve controller cards, and installing new traffic gates.

Project Administrator was responsible for RFI, RFM, submittal tracking, schedule review, scheduling and conducting progress and field meetings, as necessary. Assisted coordination with USCG and Miami River Marine Group for all work obstructing channel, and inspection of mechanical installation.

Project Engineer

Al Banz, PE

Contract

$4.3 million

Client

FDOT District 6

Location

Miami-Dade County, Florida

Duration

April 2020 - August 2021

FDOT Work Categories

10.1 Roadway CEI
10.7 Movable Span Bridge CEI

Project Gallery

NW 27th Avenue Bascule Bridge Rehabilitation

Related Projects
Browse All Projects

Movable Bridge

Bascule bridge rehabilitations and reconstructions

Roadway

Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge

Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access

Interstates, freeways and expressways

ITS & Tolling

All components of Intelligent Transportation Systems (ITS) and signaling

Transit

Vertical construction, multimodal facilities and other infrastructure projects