NW 5th Street Bascule Bridge Demolition & Replacement

Demolition prepared the site for impending new bridge construction.

Replacement included one mile of urban roadway reconstruction, structural steel bascule leaves, retaining walls, bulkheads, pier walls, drilled shafts, MSE walls, 421 LF of seawall steel sheet pile, gravity walls, concrete pier and fender composite piles.

Art Perez, PE, PSM

Contract

$3 million demolition
$59 million replacement

Client

FDOT District 6

Location

Miami, Miami-Dade, Florida

Duration

July 2008 - July 2010

FDOT Work Categories

8.1 Control Surveying
8.2 Design, Right of Way, and Construction Surveying
10.1 Roadway CEI
10.3 Construction Materials Inspection
10.4 Minor Bridge and Miscellaneous Structures CEI
10.5.1 Major Bridge CEI – Concrete,
10.5.2 Major Bridge CEI – Steel
10.7 Movable Span Bridge CEI

Project Gallery

NW 5th Street Bascule Bridge Demolition & Replacement

Related Projects
Browse All Projects

Movable Bridge

Bascule bridge rehabilitations and reconstructions

Roadway

Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge

Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access

Interstates, freeways and expressways

ITS & Tolling

All components of Intelligent Transportation Systems (ITS) and signaling

Transit

Vertical construction, multimodal facilities and other infrastructure projects