Brickell Avenue Bascule Bridge Rehabilitation
Electrical, mechanical and aesthetic rehabilitation of the twin double-leaf bascule bridges over the Miami River. Work included replacing the live load shoes and span locks, installing new sidewalk pedestrian gates, new aesthetic and decorative lighting and coating, and all structural steel and concrete.
Project Administrator was responsible for RFI, RFM, submittal tracking, schedule review, scheduling and conducting progress, and field meetings as necessary. Assisted coordination with USCG and Miami River Marine Group for all work obstructing channel and inspection of mechanical installation.
Al Banz, PE
$4 million
FDOT District 6
Miami, Miami-Dade County, Florida
November 2019 - February 2021
10.1 Roadway CEI 10.7 Movable Span Bridge CEI

Movable Bridge
Bascule bridge rehabilitations and reconstructions

Roadway
Urban and rural roadway projects, from conventional design-bid-build to design-build

Bridge
Steel plate, tub girder and concrete bridge rehabilitations and reconstructions

Limited Access
Interstates, freeways and expressways

ITS & Tolling
All components of Intelligent Transportation Systems (ITS) and signaling

Transit
Vertical construction, multimodal facilities and other infrastructure projects